Application to Appropriate Water

2 Documents in Project

Summary

SCH Number
2002061127
Lead Agency
State Water Resources Control Board
Document Title
Application to Appropriate Water
Document Type
NOD - Notice of Determination
Received
Posted
1/8/2003
Present Land Use
City zoned open space.
Document Description
The applicant seeks a right to continue to divert 1.34 cfs from the underflow of San Juan Creek. Water has been pumped from the creek at three existing wells, via three 40 horsepower pumps and discharged into two 4.8-acre feet capacity reservoirs. The applicant is now using two 25 horsepower pumps instead of the three pumps noted in application A030171. The water has been used to irrigate golf course lands, recently reaching 115 acres in size, since 1964. Applicant has been utilizing existing facilities pursuant to belief that the pumping was from percolating groundwater. A subsequent SWRCB staff analysis showed that the applicant was actually pumping from a subterranean stream. The current project is to acquire water rights to the existing diversion and use of water.

Contact Information

Name
Andrew Fecko
Agency Name
State Water Resources Control Board, Divison of Water Rights
Contact Types
Lead/Public Agency

Location

Cities
San Juan Capistrano
Counties
Orange
Cross Streets
San Juan Creek Ave. and La Novia Ave
Zip
92675
Total Acres
115
Parcel #
666-011-21, 28, 666-013-02, 05
Waterways
San Juan Creek
Township
8S
Range
7W
Section
6,7
Base
SBBM

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print