Carmel River Lagoon Restoration Project
5 Documents in Project
Summary
SCH Number
2002061088
Lead Agency
California Department of Parks and Recreation
Document Title
Carmel River Lagoon Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
10/15/2002
Present Land Use
Agriculture-existing Monterey County GP (Open Space-Draft Monterey County GP Update, currently under public review) Riparian and Wetland Habitat-Carmel River State Beach General Plan
Document Description
Recreate the South Arm of the Carmel River Lagoon to expand open water and wetland habitat, lower elevation of several acres of property adjacent to the recreated South Arm to expand wetland habitat, restore plant communities, lower the western one-third of the existing Carmel Area Wastewater District Treatment Plant Access Road to the elevation of the surrounding floodplain, to increase the volume of overbank flow entering the restoration site, regrade the eastern portion of the site to encourage overbank flow to the south and west, towards the recreated South Arm of the lagoon, remove setback levee to restore the hydrologic function of the floodplain, construct a low berm near the historic barn complex to reduce floodwater intrusion into the area, remove fill material excavated from the restoration project to agricultural property east of highway 1 and accommodate continued public use on the site.
Contact Information
Name
Shaelyn Raab Strattan
Agency Name
Department of Parks and Recreation
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carmel, Carmel-by-the-Sea
Counties
Monterey
Cross Streets
Highway 1 & CAWD access road
State Highways
1
Waterways
Carmel River and the Pacific Ocean
Notice of Determination
Approving Agency
Department Parks and Recreation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.