Pasadena Power Plant Upgrade Project
5 Documents in Project
Summary
SCH Number
2002061081
Lead Agency
City of Pasadena
Document Title
Pasadena Power Plant Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2002
Present Land Use
Power Plant/IG-SP-2-HL "56"/Specific Plan - General Industrial
Document Description
The proposed project has four main components - 1) demolition of existing obsolete facilities on portions of the Glenarm and Broadway facilities, including unused fuel oil storage tanks, the remaining foundation of a former cooling tower and various sheds; 2) decommissioning two existing boilers and their associated support equipment; 3) installation of new equipment, including two new natural gas turbines, exhaust stacks and a new ammonia tank, and 4) retrofit of exising equipment, including the addition of new selective catalytic reduction devices in the exhausts of two existing gas turbines and two new exhaust stacks for these gas turbines.
Contact Information
Name
Joshua Hart
Agency Name
City of Pasadena, Planning and Development Department
Contact Types
Lead/Public Agency
Phone
Location
Cities
Pasadena
Counties
Los Angeles
Cross Streets
E. State Street, Fair Oaks, Glenarm Street
Zip
91105
Total Acres
14.15
State Highways
110
Railways
MTA Gold Line
Schools
Blair H.S.; Allendale Elementary
Notice of Determination
Approving Agency
City of Pasadena
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.