Los Angeles Union Station Run-Through Tracks Project

4 Documents in Project

Summary

SCH Number
2002061071
Lead Agency
California Department of Transportation, District 7
Document Title
Los Angeles Union Station Run-Through Tracks Project
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2006
Present Land Use
Utility
Document Description
The proposed improvements to Union Station would extend two of the existing tracks southward from Union Station and provide a new connection into the Burlington Northern Santa Fe (BNSF) Railway mainline on the west side of the Los Angeles River; this would allow some trains that use the station to avoid the pull in/back out situation that causes delays either at the station platforms or on the connecting tracks while waiting for a slot at the platforms. The proposed structure would form an S-curve, connecting at its north/west end to track platforms at Union Station and its south/east end ot a point along the BNSF mainline in the vicinity of the First Street Bridge. A range of potential alignments has been developed that could be located in the area north of First Street. Union Station improvements to increase accessibility to platforms are also planned.

Contact Information

Name
Gary Iverson
Agency Name
Department of Transportation, District 7
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Alameda Street at First Street
Zip
90012
State Highways
U.S. 101
Railways
BNSF and UPRR
Airports
L.A. International-16.8mi. away
Schools
Cathedral High
Waterways
Los Angeles River
Township
1S
Range
13W

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print