Lindbergh Educational Village

4 Documents in Project

Summary

SCH Number
2002061050
Lead Agency
Lynwood Unified School District
Document Title
Lindbergh Educational Village
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2003
Present Land Use
Residential and Parkland; R-3 zoning
Document Description
The Lindbergh Educational Village consists of a new middle school and reconfiguration of recreational uses and vehicular drop-off at the adjacent existing Lindbergh Elemetnary School. The project site is approximately 6 acres in area. The project site is composed of three areas: (1) the southerly portion of the existing Lindbergh Elementary School (approximately 2.7 acres) - including vehicular access to the school and outdoor play areas; (2) Los Amigos Park (approximately 2.3 acres); and (3) residential units that bisect the park (approximately 1 acre). The middle school would accommodate 900 middle school students. The proposed project would alleviate overcrowding at existing Lynwood Unified School District middle schools by allowing the transfer of currently enrolled students to the new location and accommodating future enrollment demand from anticipated new and existing residents. The District proposes to acquire the 9 existing residential dwelling units (one of which also functions as a day care facility) and the park that are located on the site.

Contact Information

Name
Bertha del Rivero
Agency Name
Lynwood Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Lynwood
Counties
Los Angeles
Cross Streets
El Segundo and Peach Streets
Total Acres
~6
Parcel #
Multiple
State Highways
I-105, I-710
Railways
Southern Pacific
Airports
Compton
Waterways
Los Angeles River
Township
3S
Range
13W
Section
LA
Base
Southgat

Notice of Determination

Approving Agency
Lynwood Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print