Streambed Alteration Agreement R3-2002-0049, NTMP1-01NTMP-039 MEN

Summary

SCH Number
2002059031
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement R3-2002-0049, NTMP1-01NTMP-039 MEN
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2002
Document Description
The applicant proposes to install two permanent culverts in two small intermittent streams. The two culverts are with 50 feet of each other at the juncture of two channels. The proposed activities are on a permanent existing skid trail crossing on class II watercourses. The upstream watercourse is domestic water supply only and not fish habitat. The sides of the culverts are 36-inch and 42-inch by 15 feet long. Access will be by existing road. The culverts will be placed on the sides of the fill within the stream channel for stabilization and erosion protection. Culvert surface crossing and distrubed soil with the WLPZ will be seeded and mulched. The project sites are unnamed tributaries to Anderson Creek, Navarro watershed, Mendocino County. CDFG is executing a Lake and Streambed Alteration Agreement R3-2002-0049, pursuant to Section 1603 of the Fish and Game Code to the project applicant, Mr. Mike Heath, Vanderhorst Forestry.

Contact Information

Name
Thomas Engelhardt
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A