Opportunity Properties-Tract 29675
Summary
SCH Number
2002059008
Lead Agency
Riverside County
Document Title
Opportunity Properties-Tract 29675
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2002
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement (SAA #6-2001-213) pursuant to Section 1603 of the Fish and Game Code to the project applicant, Opportunity Properties. The applicant proposes to construct 253 single-family residential lots, 1 park site, 1 detention basin, and 1 open space lot located on an approximate 90-acre site, west of Highway 79 (Winchester Road) and east of Lean Road in the unincorporated community of French Valley. The project includes the construction of Algarve Avenue from Winchester Road to provide access to the tract and the widening of Winchester Road as required under County recommended project conditions. The existing storm drain facility, which involves an unnamed drainage that flows under Winchester Road, through an existing storm drain channel, and into the southeastern portion of the site, is comprised of an 80-foot long, triple 10-foot by 9-foot box culvert. The project proposes to extend the culvert approximately 140 feet to allow the road improvements. The jurisdictional area within the project footprint varies from 15 to 36 feet in width, with a total length of 220 feet for stormdrain improvements and approximately 40 feet for rip rap placement.
Contact Information
Name
Juan Hernandez
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.