Road Stabilization

2 Documents in Project

Summary

SCH Number
2002051053
Lead Agency
California Department of Parks and Recreation
Document Title
Road Stabilization
Document Type
NOD - Notice of Determination
Received
Posted
6/18/2002
Present Land Use
Recreation
Document Description
a) Repair/reconstruct existing drainage facilities; install new subsurface drainage, including drain planes, french drains, and weep pipes; install new culverts and overside drains; and construct earth and lined drain channels to correct existing drainage problems and decrease future road failures and erosion. b) Excavate existing roadway in areas of existing or impending instability until reaching soil suitable to support reconstruction (up to fifteen feet in depth); replace excavated soil with imported fill, to match existing grade; and repave repaired section of roadway with asphalt concrete. c) Install a retaining earth system in areas of roadway that would require excavation deeper than 15 feet or extending outside existing road easement. Stitch piers, driven to a specified depth, will be installed, with the top of the pier extending no more than six inches above the existing road grade. Once the retaining earth system is in place, damaged areas of adjacent roadway will be repaired and/or resurfaced as indicated in (b) above.

Contact Information

Name
Shaelyn Raab Strattan
Agency Name
Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
San Luis Obispo
Cross Streets
State Highway 1 and Hearst Castle Road
State Highways
1
Waterways
Arroyo del Puerto Creek and Pacific Ocean

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes