Isleton Sewage Collection System Repair and Improvements
2 Documents in Project
Summary
SCH Number
2002042160
Lead Agency
City of Isleton
Document Title
Isleton Sewage Collection System Repair and Improvements
Document Type
NOD - Notice of Determination
Received
Posted
6/18/2002
Present Land Use
The project lies within unzoned utility rights-of-way with the exception of some Multi-Family Residential south of Fifth Street.
Document Description
The existing clay pipe sewer collection system in the city of Isleton has undergone settlement and disrepair since its construction in 1923. Selected sections of the existing sewer system would be replaced with modern plastic piping to improve connections, flow and system capability.
Contact Information
Name
Tony Marshall
Agency Name
City of Isleton
Contact Types
Lead/Public Agency
Phone
Location
Cities
Isleton
Counties
Sacramento
State Highways
SR 160
Waterways
Sacramento River
Township
4N
Range
3E
Base
MDBM
Notice of Determination
Approving Agency
City of Isleton
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.