Streambed Alteration Agreement for Conditional Use Permit (00-054)
2 Documents in Project
Summary
SCH Number
2002041006
Lead Agency
City of Murrieta
Document Title
Streambed Alteration Agreement for Conditional Use Permit (00-054)
Document Type
NOD - Notice of Determination
Received
Posted
8/5/2002
Present Land Use
Civic Institutional (C/I)
Document Description
SAA #6-2002-079 The applicant proposes to alter an unnamed tributary to Murrieta Creek, to construct a 22,500 square foot one-story sanctuary building capable of seating 1,446 people, a paved parking lot providing 477 full sized spaces, and associated improvements on the approximately 11.4 acre site. The proposed improvements include filling an ephemeral stream channel by extending through the Project an existing underground storm drain system approximately 610 linear feet from the north property boundary to the southern part of the property. The project proposes to create a riparian habitat in the southeastern corner of the property, which will connect an existing mitigation area to an additionally proposed mitigation area on City-owned property to the south of the Project.
Contact Information
Name
Juan Hernandez
Agency Name
Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Murrieta
Counties
Riverside
Cross Streets
Whitewood or Busmon
Zip
92562
Total Acres
11.41
Parcel #
956-080-014
Schools
Rail Ranch
Waterways
Yoder Wash
Township
7S
Range
3W
Section
3
Notice of Determination
Approving Agency
Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.