State Route 29 and Coyote Creek Bridge Widening
4 Documents in Project
Summary
SCH Number
2002032052
Lead Agency
California Department of Transportation, District 3
Document Title
State Route 29 and Coyote Creek Bridge Widening
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2002
Present Land Use
Transportation/Open Space
Document Description
SAA R3-2002-0642 The project consists of the widening of the Coyote Creek Bridge 0.8 meters and the roadway shoulders 1.2 meters on each side of the highway between PM 11.7 and PM 12.1. Coyote Creek flows intermittently with small pools during the summer months and the area under the bridge should be dry during the construction period. However, if flow is present during construction a temporary coffer dam above and below the bridge will be constructed and flows diverted around the work area via a culvert of flexible pipe. The majority of the widening work on the bridge will be done from the existing bridge structure. To prepare for widening the bridge falsework will be erected beneath the bridge. This falsework will prevent construction materials and debris from falling into the creek and will provide access for the widening work. To erect the falsework temporary footings will be placed in the streambed immediately below the bridge. To place the footings, a small piece of equipment such as a bobcat will need to access the stream. All stream access will be from the northeast side. Upon completion of the work the falsework and footings will be removed and the streambed restored to pre-project conditions. A number of riparian plant species will be restored to better than pre-construction conditions by revegetating both banks approximately 50 feet upstream and downstream of the bridge. Construction will comply with Caltrans' Storm Water Management Plan and Best Management Practices to prevent sediment and spills from entering the streambed and water supply.
Contact Information
Name
Fred Botti
Agency Name
Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Lake
Cross Streets
SR-29/Spruce Grove
Zip
95461
State Highways
29
Waterways
Coyote Creek
Other Location Info
Middleton
Notice of Determination
Approving Agency
Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA