Long Range Development Plan and Northwest Housing Infill Project; UCLA 2002 Long Range Development Plan (LRDP) and Northwest Housing Infill Project

6 Documents in Project

Summary

SCH Number
2002031115
Lead Agency
University of California, Los Angeles
Document Title
Long Range Development Plan and Northwest Housing Infill Project; UCLA 2002 Long Range Development Plan (LRDP) and Northwest Housing Infill Project
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2003
Present Land Use
Campus
Document Description
The project will construct a four-level parking structure with approximately 299 parking spaces, representing approximately 86,250 gsf of new construction in the Northwest-zone of the University of California, Los Angeles (UCLA) campus. The parking structure will be built into the hillside between Dykstra Hall and Tom Bradley International Hall on the existing surface parking lot DH. The project will replace 233 existing surface spaces and will provide approximately 66 additional spaces. The parking structure will serve residence hall housing proposed as a part of the Northwest Housing Infill Project (NHIP), as well as the Tom Bradley International Hall. The parking entrance level will be at the same grade as the Bradley Motor Court with three levels of parking partially below grade. Pedestrian access will be integrated into the surrounding paths.

Contact Information

Name
Tova Lelah
Agency Name
University of California, Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Westwood Blvd. and LeConte Ave.
Zip
90095
State Highways
I-405

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print