Tower Bridge Painting Project
Summary
SCH Number
2002018382
Public Agency
California Department of Transportation, District 3
Document Title
Tower Bridge Painting Project
Document Type
NOE - Notice of Exemption
Received
Posted
1/24/2002
Document Description
The project purpose is to paint the Tower Bridge to protect the structural integrity of the steel. The percentage of rusting on the bridge is approximately between 5-10% of the total steel surface area. This corrosion results in losses in some of its section or size potentially reducing its load carrying capacity; therefore painting the bridge will prevent this degradation. The first step of the painting process is to put in palce scaffolding and a containment system of sandbags and tarps, and other appropriate containment measures to insure capture of project spoils and debris. This action will be followed by cleaning the steel surface where paints will be applied using a high-pressure water wash system. Hand and power tool cleaning will remove steel containing rust or any other foreign substances that are not removeable by high-pressure washing. Rust locations will be cleaned down to bare metal.
Contact Information
Name
Gregoria Ponce Garcia
Agency Name
Department of Transportation, District 3
Contact Types
Lead/Public Agency
Phone
Location
Cities
West Sacramento
Counties
Yolo
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1,
Reasons for Exemption
This project has been determined not to have a significant effect on the environment and is therefore exempt from the provisions of CEQA.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.