Rancho Monte Alegre (RMA) Annexation and Water Tank Project

9 Documents in Project

Summary

SCH Number
2002011085
Lead Agency
City of Carpinteria
Document Title
Rancho Monte Alegre (RMA) Annexation and Water Tank Project
Document Type
NOD - Notice of Determination
Received
Posted
1/9/2003
Present Land Use
Agriculture 1
Document Description
Construction of a below ground Water Storage Tank (lower tank) of 3 million-gallon (MG) capacity; Annexation of an approximately 2,150-acre area of Rancho Monte Alegre, and 115 acres of other adjoining properties under various ownership into the CVWD service area boundaries, resulting in a total annexation area of 2,265 acres; Construction of two aboveground Water Storage Tanks (upper tanks) of 200,000-gallon capacity; Various associated Road Improvements and Pipeline Installations; Reconfiguration of 3 existing RMA parcels resulting in the Creation of one District parcel of 10 acres and modifications of the 3 RMA parcels.

Contact Information

Name
Charles Hamilton
Agency Name
City of Carpinteria Valley Water District (CVWD)
Contact Types
Lead/Public Agency

Location

Cities
Carpinteria
Counties
Santa Barbara
Cross Streets
Foothill Road and Santa Monica Road
Zip
93013
Total Acres
2,265
State Highways
US 10
Schools
Carp High School
Waterways
Santa Monica, Sutton Canyon and Franklin Creeks

Notice of Determination

Approving Agency
Carpinteria Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print