Site 31 Effluent Pipeline and Pump Station

2 Documents in Project

Summary

SCH Number
2002011054
Lead Agency
Western Municipal Water District
Document Title
Site 31 Effluent Pipeline and Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2002
Present Land Use
The majority of the proposed improvements are within road rights-of-way. The areas surrounding the remaining facilities are zoned for industrial land uses. The surrounding area is currently developed for agricultural land uses and industrial.
Document Description
Western Municipal Water District is proposing to construct an approximately 3.5 mile 8-inch diameter non-potable water transmission line and associated pump station. The water conveyed by this project is generated by March Air Reserve Base ground water remediation effort, and is the product of a treatment system, referred to as Site 31 EGETS. The site 31 EGETS water will be conveyed to the March Air Reserve Base wastewater treatment plant where the water will be discharged into exisitng irrigation pipelines. The Site 31 EGETS non-potable water will be used for irrigation of the Riverside National Cemetary.

Contact Information

Name
John Dahlke
Agency Name
Western Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Moreno Valley, Perris, Riverside
Counties
Riverside
Cross Streets
Heacock St. south of Iris Ave. to Oleander Ave. west of Heacock St.
Total Acres
5
Parcel #
295-300-013-WWTP
State Highways
215
Railways
BNSF
Airports
March Air Reserve Base
Waterways
Perris Valley Storm Drain
Township
3S
Range
4&3W
Other Information
Section: 25,26,35,30,31

Notice of Determination

Approving Agency
Western Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.