Removal Action Workplan for the CADA Site

Summary

SCH Number
2001118425
Public Agency
Department of Toxic Substances Control
Document Title
Removal Action Workplan for the CADA Site
Document Type
NOE - Notice of Exemption
Received
Posted
11/30/2001
Document Description
The Removal Action Workplan will remediate polycyclic aromatic hydrocarbons (PAHs) in near surface soil that are above unrestricted use levels. The removal action will excavate approximately 685 cubic yards of soil to a depth of up to eight feet for offsite disposal. Based on the risk assessment, the hazardous waste has a low toxicity. The Site will be backfilled with clean soil and then paved with asphalt. The entire removal action will take about 25 to 30 working days to be completed. The on-site construction time should only take 10-15 days.

Contact Information

Name
Duane White
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15330
Reasons for Exemption
Minor cleanup activities taken to mitigate or eliminate the release, or threat of a release of hazardous substances.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print