NEES Centrifuge Support Building
2 Documents in Project
Summary
SCH Number
2001102070
Lead Agency
University of California, Davis
Document Title
NEES Centrifuge Support Building
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2002
Present Land Use
Academic and Administrative Low Density
Document Description
UC Davis proposes to construct and operate a new 4,720 gross square foot building to support research activities at the Network for Earthquake Engineering Simulation (NEES) Centrifuge site. The building would be located adjacent to the existing centrifuge facility near the hydraulics laboratory west of Brooks Road on the west campus. The proposed building would include space for offices, a conference and computer area, and space for preparing testing materials. The building is expected to be constructed on a concrete foundation with a steel frame structure, metal panel sheathing, and a metal panel roof. Project elements surrounding the building would include a new gravel area for employee parking, a new gravel entrance drive, and a new septic system.
Contact Information
Name
Sid England
Agency Name
University of California, Davis
Contact Types
Lead/Public Agency
Phone
Location
Cities
Davis
Counties
Yolo
Cross Streets
West of Brooks Road
Zip
95616
Total Acres
0.5
State Highways
113, I-80
Railways
Union Pacific
Airports
University Airport
Schools
Davis Joint Unified
Waterways
Putah Creek
Township
8N
Range
2E
Section
18
Base
MtDiablo
Notice of Determination
Approving Agency
Board of Regents, University of California, Davis
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A