Grant Area Aquifer Testing Project

2 Documents in Project

Summary

SCH Number
2001101099
Lead Agency
Indian Wells Valley Water District
Document Title
Grant Area Aquifer Testing Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2001
Present Land Use
The project is located in the vicinity of the isolated desert community of Grant, just south of Olancha. The surrounding land uses are primarily agricultural and open desert areas, with a small trailer park, motel and fire station located nearby. Zoning: RR5
Document Description
The Districts proposed Grant Area Aquifer Testing Project consists of the construction of up to three 6" to 10" diameter monitoring wells, zone testing and pump testing of the monitoring well(s) to determine water quality, construction of one 12" to 16" diameter test well, and performance of a pump test (up to three days in duration) to assist in determining aquifer characteristics. Test water will be percolated into the ground locally using surface discharge along disturbed areas of the property. Depending on test results, IWVWD may purchase the Grant area property.

Contact Information

Name
Mike Lovejoy
Agency Name
Indian Wells Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
U.S. Highway 395/Cactus Flat Road
Zip
93549
Total Acres
388.39
Parcel #
33-110-32, 33-490-02
State Highways
U.S. Highway 395
Waterways
Los Angeles Aqueduct
Township
19S
Range
37E
Section
29
Base
MtDiablo
Other Location Info
Olancha

Notice of Determination

Approving Agency
Indian Wells Valley Water Districts Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print