Nickel and Nickel Winery
2 Documents in Project
Summary
SCH Number
2001089028
Lead Agency
Napa County
Document Title
Nickel and Nickel Winery
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2002
Document Description
In conjunction with the establishment of a 125,000 gallon per year winery, the operator proposes to install 225 feet of willow revetment, a 1.5 foot rock drop structure, removal of existing concrete and asphalt rubble from the channel, Pierce's Disease host plant removal, and the revegetation of native species on an unnamed tributary to the Napa River at 8164 St. Helena Highway, APN 031-010-003, Oakville, Napa County. The drainage is approximately 700 linear feet in length, 30 to 60 feet in width, and averages approximately 8 feet deep. The banks were cleared of vegetation previously and the new owners would like to restore the drainage. The willow revetments are poposed from 0+00 to 1+20 and 2+13 to 3+15 to stabilize the near vertical bank. A loose, natural rock drop structure is proposed for station 1+93 to 2+13 to be used as a grade control structure and to stabilize the bed. The drop structure is approximately 20 feet in length and will drop approximately 1.5 feet over a 4.5 foot stretch.
Contact Information
Name
Greg Martinelli
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Napa
Counties
Napa
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A