Pressure Control and Hydroelectric Facility

2 Documents in Project

Summary

SCH Number
2001081027
Lead Agency
San Diego County Water Authority
Document Title
Pressure Control and Hydroelectric Facility
Document Type
EIR - Draft EIR
Received
Present Land Use
Open Space and Parks
Document Description
The proposed Rancho Penasquitos Pressure Control and Hydroelectric Facility (PCHF) consists of a rectangular reinforced concrete structure, associated valves, piping, electrical switch gear, controls, and instrumentation. The concrete structure would be approximately 110 feet long by 70 feet wide. The PCHF would be partially buried, and the highest above-ground point would be 18 feet. The main facility would house pressure control valves, a hydroelectric generator, electrical switch gear and controls/instrumentation. The project would also include two below-grade concrete valves vault structures that would house large isolation valves, one measuring 30 by 40 feet, the second approximately 20 by 20 feet.

Contact Information

Name
Kelley Gage
Agency Name
San Diego County Water Authority
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
I-15 and Mercy Road
State Highways
I-15
Waterways
Los Penasquitos Creek
Base
SBM
Other Location Info
Mira Mesa/Rancho Penasquitos

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Energy Commission, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Pressure control facility)
Project Issues
Aesthetics, Air Quality, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Transportation, Vegetation, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print