Streambed Alteration Agreement 2000-1229

Summary

SCH Number
2001069054
Lead Agency
Hueneme School District
Document Title
Streambed Alteration Agreement 2000-1229
Document Type
NOD - Notice of Determination
Received
Posted
6/28/2001
Document Description
The following project activities (2) involve one installation of a class I bridge crossing (see attached map point #11), the replacement of one class II culvert (see attached map point #5) and alteration of bed, bank, or channel in the North Fork 10 Mile River Watershed. Both activities are approximately .25 areal miles apart. Each crossing is located approximately 4.5 areal miles inland from the coast and north of Bucha Ridge as described in the timber harvest plan (1-00-347 MEN) located on Hawthorne Timber Company (HTC) property. The timber harvest plan (THP) map "Bucha Ridge THP Section 19; T20N; R16W; Duchmans Knoll USGS Map" specifically indicates the location at which the crossings will require the Streambed Alteration Agreement. The topographic exposure is north west and slopes are moderately steep. The elevation at the site is approximately 400 feet at the class II and less than 200 feet at the class I crossing. The site visit was conducted on September 21, 2000 and no running water was observed at the class II site during the inspection.

Contact Information

Name
John Hendrix
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency

Location

Counties
Mendocino

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A