Manzanita Avenue Widening Project
4 Documents in Project
Summary
SCH Number
2001062124
Lead Agency
City of Chico
Document Title
Manzanita Avenue Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2007
Present Land Use
Existing roadway, no land use designations.
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2007-0079-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Chico.
The project includes the reconstruction of Manzanita Avenue from approximately 500 feet east of Lindo Channel to approximately 250 feet east of Centennial Avenue. The existing Big Chico Creek Bridge will be widened and retrofitted to accommodate bicycle/pedestrian/equestrian lanes. To accomplish this, an additional 13.5 feet and 8 new 18-inch pilings will be required on the south side of the bridge and 9.0 feet and 4 new 18-inch pilings on the north side. The bridge will be expanded from its current 55.5-foot configuration to approximately 78 feet. The existing Big Chico Creek undercrossing and approach paths adjacent to the southeasterly creek bank/bridge abutment will be improved/hardscaped. A storm drain outfall will be constructed downstream of the Manzanita Avenue Bridge and upstream of the bicycle/pedestrian/equestrian bridge.
Contact Information
Name
Gary L. Hobgood
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Chico
Counties
Butte
Cross Streets
multiple
Parcel #
multiple
State Highways
State Route 32
Railways
1
Waterways
Big Chico Creek, Lindo Channel, Dead Horse Slough
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.