Matanzas Creek Reservoir Sediment Removal Project
5 Documents in Project
Summary
SCH Number
2001062092
Lead Agency
Sonoma County Water Agency
Document Title
Matanzas Creek Reservoir Sediment Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
1/11/2006
Present Land Use
Zoned Resources and Rural Development; currently used as flood control reservoir.
Document Description
The project is the dredging of accumulated sediment from Matanzas Creek Reservoir on Matanzas Creek, tributary to Santa Rosa Creek, thence the Russian River. To restore floodwater storage capacity within Matanzas Creek Reservoir, approximately 120,000 cubic yards of accumulated sediment will be removed, vegetation encroaching on the reservoir will be removed, and permanent access roads will be constructed to the reservoir and to the stream downstream of the dam. The project will include the planting of native riparian and woodland vegetation around the perimeter of the reservoir following dredging and removal of the vegetation growing on the accumulated sediment in the bottom of the reservoir. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2005-0233-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sonoma County Water Agency.
Contact Information
Name
Bill Cox
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Santa Rosa
Counties
Sonoma
Cross Streets
Bennett Valley Road
Zip
95404
Parcel #
049-130-006; 049-150-009
Waterways
Matanzas Creek
Township
7N
Range
7W
Section
32
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.