Westside Acquisition Project

3 Documents in Project

Summary

SCH Number
2001062089
Lead Agency
Turlock Irrigation District
Document Title
Westside Acquisition Project
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2001
Present Land Use
Agricultural, industrial, commercial, residential, and other urban uses.
Document Description
The Turlock Irrigation District (TID), a public entity, plans to purchase electric facilities within 225 square miles of western Stanislaus County from Pacific Gas & Electric Corporation (PG&E), a regulated utility. The negotiated purchase includes approximately 200 linear miles of distribution facilities, all the equipment at the Patterson Substation, the distribution equipment within the Salado Substation, 0.25 miles of 60 kV transmission line into the Patterson Substation, and eventually, a 1.1-mile 60 kV transmission tap line to Patterson Frozen Foods. The transfer agreement also includes the lease of the land at the Patterson Substation and a portion of the Salado Substation property. The proposed project also includes the physical changes needed for TID to operate the acquired facilities independent of the PG&E system and serve the customers within the zone, including installing severance facilities at eight points in the distribution system along the boundaries of the new TID Westside service zone. TID also plans to acquire from PG&E the right to serve the electricity in the South Short Zone, an area near Don Pedro Reservoir that presently contains limited distribution facilities and would not require any severance construction.

Contact Information

Name
Chris Kiriakou
Agency Name
Turlock Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Patterson
Counties
Mariposa, Stanislaus, Tuolumne
Total Acres
<2
State Highways
33, I-5
Railways
Union Pacific
Airports
Patterson, NASA Crows Landing
Waterways
Orestimba and Del Puerto creeks, Aqueduct, canals
Township
4-6S
Range
6-8E
Other Location Info
Crows Landing

Notice of Determination

Approving Agency
Turlock Irrigation District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes