Tejon Ranch Water Management and Exchange and Wheeler Ridge-Maricopa Water Storage District 850 Canl/Reservoir 1 Pump-back

8 Documents in Project

Summary

SCH Number
2001061013
Lead Agency
Wheeler Ridge -Maricopa Water Storage District
Document Title
Tejon Ranch Water Management and Exchange and Wheeler Ridge-Maricopa Water Storage District 850 Canl/Reservoir 1 Pump-back
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2006
Present Land Use
Irrigated agriculture and grazing are the main land uses in the project area. Most of the project area is zoned as "A" Exclusive Agriculture, and is given a "Resource" designation in the Kern County General Plan.
Document Description
The project contains two components: (a) water right applications 30325 - 30329 and 31043 - 31048, filed with the State Water Resources Control Board (State Water Board) in 1993 and 1999, and (b) WRMWSD's 850 Canal/Reservoir No. 1 Pump-back. TRC would construct ten new pipelines and nine new weirs to divert water from El Paso, Grapevine, Live Oak, Pastoria, Tecuya, Tejon, and Tunis Creeks as part of the project. TRC will divert a maximum of 15,000 acre-feet per annum (afa) of water by direct diversion and storage, to be used for the purposes of irrigating almonds, grain forage, grapes, olives, pistachios, row crops, and walnuts, mining, and stock watering on WRMWSD and TRC lands. WRMWSD proposes to construct a pump-back facility to pump water from the 850 Canal into Reservoir No. 1 during off-peak energy use hours. The pump-back facility would require the replacement and extension of an existing pipeline and the installation of a new pump station.

Contact Information

Name
Victoria A. Whitney
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Maricopa
Counties
Kern
Cross Streets
Numerous
Zip
93313
Total Acres
~ 23,200
Parcel #
Numerous
State Highways
I-5
Waterways
Tejon,El Paso,Tunis,Pastoria,Liveoak,Grapevine,Tecuya Creeks;California Aqueduct
Township
Multip
Range
Multip
Section
Multip
Base
Multiple
Other Information
California Aqueduct

Notice of Determination

Approving Agency
State Water Board, Division of Water Rights
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print