Treatment Plant Access Road Repair and Markleeville Creek Bank Stabilization
Summary
SCH Number
2001058528
Public Agency
State Water Resources Control Board
Document Title
Treatment Plant Access Road Repair and Markleeville Creek Bank Stabilization
Document Type
NOE - Notice of Exemption
Received
Posted
5/25/2001
Document Description
A portion of the Markleeville Creek adjacent to the Markleeville Public Utilities District Treatment Plant access road has undergone erosion due to long term hydrualic modifications from upstream improvements and incremental impacts of recent flood events. The toe and bank of the stream will require stabilization to reduce further erosion and stabilize toe, bank, access road, and installed infrastructure. The project has two major components as follows: 1) Stabilization of the toe for 250 lineal feet, including installation of rip-rap, groins, and planting and, 2) Stabilizing the bank and resconstructing eroded portions fo the access road above the toe, including minor modifications to existing sewer trunk and water line infrastructure.
Contact Information
Name
James Hockenberry
Agency Name
State Water Resources Control Board, Division of Clean Water Pro
Contact Types
Lead/Public Agency
Phone
Location
Counties
Alpine
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15302
Reasons for Exemption
Project consists of minor modifications to existing sewer trunk and water line and stabilization of toe and bank to reduce erosion.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.