U.S. 101 - Marin/Sonoma Narrows HOV Widening Contract B2, EA-2640UI

15 Documents in Project

Summary

SCH Number
2001042115
Lead Agency
California Department of Transportation, District 4
Document Title
U.S. 101 - Marin/Sonoma Narrows HOV Widening Contract B2, EA-2640UI
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2012
Document Description
The western bank of the flood control channel on the east side of the NB U.S 101 onramp from SR 116 will be temporarily impacted by the project. The flood control channel spans the length between culvert underneath SR 116 and the bridge over Caulfield Lane, a distance of over 2,000 feet. The western bank of the flood control channel will be impacted by access needed for construction personnel, equipment and materials to build the retaining wall and sound walls. There will be no impact to the bed of the flood control channel (no impacts below the ordinary high water mark [OHWM]). Approximately 0.295 acres (1,935 linear feet) of the flood control channel bank will be temporarily impacted by the project. Temporary impacts will include work access and installation of temporary material such as silt fence, ESA fencing and erosion control BMP's.

Contact Information

Name
Adam McKannay
Agency Name
Department of Fish and Game, Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Novato, Petaluma
Counties
Marin, Sonoma
Cross Streets
US 101 / Route 37, US 101 / Route 116
State Highways
37, 116
Railways
SMART
Airports
Gnoss Field
Waterways
San Pablo Bay, Petaluma River, various creeks

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes