King Road Water Pipeline Project
2 Documents in Project
Summary
SCH Number
2001012090
Lead Agency
Placer County Water Agency
Document Title
King Road Water Pipeline Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Rural Residential
Document Description
The King Road Pipeline project is proposed by PCWA to provide a more reliable water delivery system by improving local water service pressure to existing residential users in the service area. Residents in the project area have expressed interest in expanding the existing water distribution system to provide a more reliable water delivery system that shifts water reliance from existing groundwater wells to surface water. The proposed project consists of installing approximately 3,800 feet of 12-inch pipe. The corridor proposed for this new water pipeline is predominately located under existing roadways. PCWA is serving as the lead agency under CEQA.
Contact Information
Name
Dale Bohnenberger
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency
Phone
Location
Cities
Loomis
Counties
Placer
Cross Streets
King Road, Auburn-Folsom Road, and Kingmont Road
State Highways
I-80
Waterways
Secret Ravine
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Native American Heritage Commission (NAHC), California State Lands Commission (SLC), Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board
State Reviewing Agency Comments
California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board
Development Types
Water Facilities (Type Pipeline)
Local Actions
Pipeline Construction
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.