Petition to Increase Simple-Cycle Operating Hours for the Sunrise Power Project

8 Documents in Project

Summary

SCH Number
2000129017
Lead Agency
California Energy Commission
Document Title
Petition to Increase Simple-Cycle Operating Hours for the Sunrise Power Project
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2001
Document Description
The applicant proposes to modify an existing 320 megawatt natural gas-fired simple cycle power plant. Changes include an expanded project footprint, 15.5 miles of water line, 2.5 miles of wastewater disposal line, up to six deep injection wells and a .9 mile recycle water line. The amended project may result in impacts to San Joaquin antelope squirrel, giant kangaroo rat, Tipton kangaroo rat, San Joaquin kit fox, Bakersfield smallscale, and California jewelflower which are protected under the California Endangered Species Act, requiring issuance of a California Incidental Take Permit (Permit) for these species. The blunt-nosed leopard lizard, which is State-listed and a fully protected reptile, may also occupy the project area, but incidental take of the blunt-nosed leopard lizard is not authorized by the permit and the permit holder must avoid take of this species.

Contact Information

Name
Donna Daniels
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Kern

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.