Sunrise Power Project
8 Documents in Project
Summary
SCH Number
2000129017
Lead Agency
California Energy Commission
Document Title
Sunrise Power Project
Document Type
NOD - Notice of Determination
Received
Posted
12/6/2000
Document Description
A 320 Megawatt simple cycle power generation project consisting of two natural gas-fired combustion turbine generators. Associated facilities include a 2.5 mile long, 20-inch diameter natural gas supply line, two water supply pipelines with totaling a length of 2,000 feet, and an 23.3 mile long, 230 kilovolt double-circuit transmission line to the Pacific Gas & Electric Midway substation near Buttonwillow.
Contact Information
Name
Marc Pryor
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency
Phone
Location
Counties
Kern
Notice of Determination
Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.