Passport Homes Minor Subdivision

2 Documents in Project

Summary

SCH Number
2000122077
Lead Agency
City of Martinez
Document Title
Passport Homes Minor Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
9/24/2001
Present Land Use
Land Use-Vacant Zoned-RR-20 (Rural Residential-20,000 square feet lot minimum)
Document Description
The operator proposes to widen Vinehill Road to provide a pedestrian walkway, approximately 100 feet southeast of John Muir Drive in Martinez, Contra Costa County impacting an unnamed tributary to Alhambra Creek. The existing double 24" culverts will be extended approximately 10 linear feet and a concrete headwall will be constructed. Approximately 6 linear feet of riprap will be placed from bank to bank immediately in front of the headwall. The existing 18" outfall pipe on the southeast bank will be removed from the bank and relocated to discharge into the culverts. The California Department of Fish and Game is executing a lake and streambed alteration agreement number R3-2001-0518 pursuant to section 1601 of the Fish and Game Code to the project operator, Richard Pearson, City of Martinez.

Contact Information

Name
Greg Martinelli
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Martinez
Counties
Contra Costa
Cross Streets
Vine Hill Way/East Pleasant Hill Road
Total Acres
2.11
Parcel #
162-110-013 and 020
State Highways
SR-4
Railways
Union Pacific
Waterways
Alhambra Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A