Malaga Reclamation Project-Phase II

2 Documents in Project

Summary

SCH Number
2000121023
Lead Agency
Malaga County Water District
Document Title
Malaga Reclamation Project-Phase II
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2001
Present Land Use
Present land use-wastewater treatment facilites/Zoning-Limited Agricultural/General Plan Designation-wastewater disposal
Document Description
The Malaga County Water District (MCWD) proposes to construct a) filtration facilities and appurtenances for tertiary filtration, b) replacement of an existing open screw pump and appurtenances, c) replacement of sludge thickening equipment, and d) installation of groundwater monitoring wells at the existing wastewater treatment plant or nearby properties. The improvements are intended to satisfy terms and conditions of the existing Waste Discharge Requirements and to improve the existing facilities to prevent potential public health and pollution problems. The existing equipment (screw pump and sludge thickener) have exceeded their projected useful lives and have declined in effeciency. The screw pump has declined to the point that repairs are no longer possible and it is no longer operated. The filtration facilities are required to complete improvements at the treatment plant necessary to satisfy existing requirements. The water levels in the disposal ponds have exceeded the required freeboard for the past two years and pose a threat to surrounding properties in the event of failure of the embankments.

Contact Information

Name
Gerald W. Forde
Agency Name
Malaga County Water District
Contact Types
Lead/Public Agency

Location

Counties
Fresno
Cross Streets
Central Avenue/Maple Avenue
Zip
93725
Total Acres
1
Parcel #
330-100-07 & 330-100-09
State Highways
99
Railways
AT&SF
Schools
Malaga
Waterways
Central Canal (Fresno Irrigation District)
Township
14S
Range
20E
Section
25
Base
MDB&M
Other Location Info
Malaga

Notice of Determination

Approving Agency
Malaga County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print