National Training Center

10 Documents in Project

Summary

SCH Number
2000101041
Lead Agency
California State University Board of Trustees
Document Title
National Training Center
Document Type
NOD - Notice of Determination
Received
Posted
2/15/2006
Present Land Use
NA (State University Campus), Carson General Plan designation is Public Facilities
Document Description
This project is located north of the velodrome, approximately 400 feet to the northeast of the University Heights and approximately 500 feet north University Drive. The lighting system, which surrounds the track and field stadium, illuminates the inner grass playing field as well as the perimeter 400-meter Olympic track. The permanent lighting system consists of 10 poles with 7 to 10 light fixtures mounted on each pole. Three poles each are located on the east and west sides of the facility, and two poles each on the north and south sides of the facility. To reduce the potential for spillover light and glare, all installed lights are equipped with cut-off hoods that further confine the angle of light to illuminate only the intended area.

Contact Information

Name
David A. Rosso
Agency Name
Trustees of the California State University
Contact Types
Lead/Public Agency

Location

Cities
Carson
Counties
Los Angeles
Cross Streets
Avalon Boulevard, Victoria Street
Zip
90747
State Highways
I-405, SR-91, I-110, I-710
Railways
Alameda Corridor
Airports
Compton
Waterways
Dominguez Channel, Compton Creek
Township
3S
Range
13W

Notice of Determination

Approving Agency
The Board of Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print