Agreement Regarding Proposed Stream Alteration (SAA #5-046-00) for the installation of the Santiago Creek Recharge Turnout Pipe

Summary

SCH Number
2000079067
Lead Agency
Fish & Game #2
Document Title
Agreement Regarding Proposed Stream Alteration (SAA #5-046-00) for the installation of the Santiago Creek Recharge Turnout Pipe
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2000
Document Description
The CDFG has issude an Agreement Regarding Proposed Stream Alteration (SAA #5-046-00) ("agreement") to Orange County Water District ("applicant") in conjunction with the applicant's proposal to of a 42-inch diameter turnout pipe, a rip-rap splash pad, slope protection at the creek bank, and a small instrument shelter (5x5x8; 7x7-foot concrete pad). The pipeline turnout would divert up to 15 cubic feet per second of water from the existing Santiago Pipeline into Santiago Creek for groundwater recharge. A flap gate would be installed on the outfall structure. The water would run along the Santiago Creek to approximately Tustin Avenue (approximately 2 miles) before all water would have percolated into the ground. The ungrouted rip-rap splash pad would be placed at the bottom of Santiago Creek in an area of approximately 500-square feet. The construction area needed for the installation of the rip-rap extends approximately 35-feet north and south of the rip-rap structure and approximately 12-feet west of the centerline of the creek. The project will impact 0.12 acre of stream, woth less than 0.01 acre of riparian species: 0.02 acre of permanent impact to stream and 0.10 acre of temporary impact to stream. Mitigation measures include planting 0.12 acre of mulefat saplings on-site.

Contact Information

Name
Terri Dickerson
Agency Name
Department of Fish and Game, Region 5
Contact Types
Lead/Public Agency

Location

Cities
Orange
Counties
Orange

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes