Castle Rock Hardwoods - Use Permit UP0048C
2 Documents in Project
Summary
SCH Number
2000072083
Lead Agency
Del Norte County
Document Title
Castle Rock Hardwoods - Use Permit UP0048C
Document Type
NOD - Notice of Determination
Received
Posted
9/15/2000
Present Land Use
Industrial (Mill site) Zoning: M (Manufacturing) General Plan: Ind (Industrial)
Document Description
Use Permit for a sawmill operation that includes processing equipment for raw logs to sawed lumber. The site includes existing mill buildings previously used for plywood manufacturing. The site also includes storage buildings and a watchman's quarters. The site is served by Standard Veneer Road and private driveways. Outside uses include a debarker and storage of lumber and heavy equipment. All other uses are designed for inside use. Noise, biological, and traffic studies have been prepared for the project. The site to be used for the project is zoned M (Manufacturing). Adjacent zonings include M, RCA (General Resource Conservation Area), and A-20 (General Agriculture).
Contact Information
Name
Jay Sarina
Agency Name
Del Norte County Planning
Contact Types
Lead/Public Agency
Phone
Location
Cities
Crescent City
Counties
Del Norte
Cross Streets
Standard Veneer road & Lake Earl Drive
Total Acres
9.6
Parcel #
110-440-10
State Highways
101
Schools
Pine Grove Elementary
Waterways
Lake Earl, Un-named pond
Township
16N
Range
1W
Section
9
Base
HB&M
Notice of Determination
Approving Agency
Jay Sarino
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.