UCDNet2
3 Documents in Project
Summary
SCH Number
2000062145
Lead Agency
University of California, Davis
Document Title
UCDNet2
Document Type
NOD - Notice of Determination
Received
Posted
8/30/2000
Document Description
The University of California, Davis, proposes to construct and operate the UCDNet2 Project on the UC Davis campus. The project would extend the existing campus fiber optic infrastructure into areas of the campus which currently do not have access to existing services or where the level of service is inadequate for anticipated growth. These areas include: (1) the Research Park complex, (2) buildings and facilities in the West Campus, (3) buildings and facilities in the South Campus, and (4) a few facilities in the Central Campus. The project would include the construction of two 300-square foot equipment buildings. One structure would be on the West Campus approximately 20 feet north of the Pomology Headquarters on the east side of Hopkins Road. The second structure would be on the South Campus located approximately 1/4 mile south of Interstate 80 and approximately 50 feet west of Old Davis Road. The UCDNet2 project also includes underground installation of approximately 12 miles of new fiber optic cable conduit in the Central, West, and South Campuses through a combination of trenching and horizontal boring to place new conduits. At other locations, existing conduits will be used. The project also includes the installation of fiber optic cables within existing buildings including the construction and remodeling of telecommunications closets, as required, and the installation of network electronics.
Contact Information
Name
Sid England
Agency Name
University of Caifornia, Davis
Contact Types
Lead/Public Agency
Phone
Location
Cities
Davis
Counties
Solano, Yolo
Total Acres
0.5-
State Highways
113
Railways
Union Pacific
Airports
University Airport
Waterways
Putah Creek
Township
8N
Range
2E
Section
15-22
Base
MDBM
Other Location Info
UC Davis
Notice of Determination
Approving Agency
University of California, Davis
Approving Agency Role
Lead Agency
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.