Simpson Timber Company Demolition Coastal Development Permit

2 Documents in Project

Summary

SCH Number
2000052116
Lead Agency
Humboldt County
Document Title
Simpson Timber Company Demolition Coastal Development Permit
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2000
Present Land Use
Industrial-Former Timber Processing Complex Zoning: Coastal Dependent Industrial General Plan: Coastsl Dependent Industrial
Document Description
A Coastal Development Permit to decommission and dismantle several facilities and structures associated with the former Louisiana Pacific timber processing complex on the Samoa Peninsula. The work to take place involves demolition and removal of the following: 1.) a sawmill building; 2.) a power plant; 3.) drying kilns; 4.) three above-ground tank containers; 5.) a steam-cleaning station and north fueling station, 6.) warehouse 16, and 7) three small docks and numerous miscellaneous pilings. No work on land will take place below grade, and no work will take place outside of the former timber processing complex. The docks and pilings are within the permit jurisdiction of the State, and a separate Coastal Development Permit for their removal will be required from the California Coastal Commission.

Contact Information

Name
Michael E. Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
New Navy Base Road/Cookhouse Road
Zip
95564
Parcel #
401-031-28 et al.
State Highways
US 101
Railways
Northwest Pacific
Airports
Eureka Municipal
Schools
Peninsula Union School
Waterways
Humboldt Bay
Township
5N
Range
1W
Section
15,16,
Base
HM
Other Information
Section: 21 Total Acres: located entirely within former Louisiana-Pacific timber processing complex

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.