TPM 20408, Log No. 98-19-017 Monroy TPM

2 Documents in Project

Summary

SCH Number
2000041050
Lead Agency
San Diego County
Document Title
TPM 20408, Log No. 98-19-017 Monroy TPM
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2000
Present Land Use
The project is within the Jamul-Dulzura Community Plan and present land use designation is 18 Multiple Rural Use with a 1 du/4,8,20 acre(s). The zoning is A72 with 1 du/8 acre(s).
Document Description
The project is a minor subdivision of 19.7 acres in 2 parcels. An existing residence will remain on Parcel 1 of 10.18 acres and Parcel 2 will be 9.51 acres. The existing house and any future residence built on Parcel 2 will be on septic and will utilize groundwater. A 20-foot wide road easement will be included in the project along the southern boundary of the property to allow access from adjacent parcels to Lyons Valley Road. The project is within the Metro-Lakeside-Jamul Segment of the County of San Diego Subarea Plan of the Multiple Species Conservation Program (MSCP). Steep slope, Biological and Fire Clearing Easements are included in the design of this project for the protection of steep slopes. Coastal sage curb and a small drainage.

Contact Information

Name
Dawn Dickman
Agency Name
San Diego County, DPLU
Contact Types
Lead/Public Agency

Location

Cities
Jamul
Counties
San Diego
Cross Streets
Lyons Valley Road, between Tucker Trail and Harper Ranch Road
Total Acres
19.7
Parcel #
599-100-34, 47
Township
17S
Range
02E
Section
8
Other Location Info
Jamul
Other Information
Range: San Bernardino Meridian

Notice of Determination

Approving Agency
County of San Diego Director of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A