Tracy Wastewater Treatment Plant Expansion Project

6 Documents in Project

Summary

SCH Number
2000012039
Lead Agency
City of Tracy
Document Title
Tracy Wastewater Treatment Plant Expansion Project
Document Type
NOP - Notice of Preparation
Received
Present Land Use
Present Land Use: Wastewater treatment plant General Plan: Public Facilities
Document Description
Proposed expansion of the City's existing wastewater treatment. The existing WWTP provides secondary treatment and disinfection before discharging to Old River and has a design flow capacity of 9.0 MGD. Over the next decade, new commercial and residential development within Tracy is expected to increase the average wastewater flow to the plant from 6.5 to 16.0 MGD. The proposed project will increase plant capacity by installing additional facilities, while simultaneously upgrading the plant in anticipation of more stringent effluent discharge requirements.

Contact Information

Name
Robert Conant
Agency Name
City of Tracy
Contact Types
Lead/Public Agency

Location

Cities
Tracy
Counties
San Joaquin
Cross Streets
Holly Drive / Larch Road
State Highways
205, 580
Railways
Union Pacific
Waterways
Old River
Base
Tracy

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Divison of Financial Assistance, California Department of Health Care Services (DHCS), Department of Water Resources, Central Valley Flood Protection Board
State Reviewing Agency Comments
California Department of Health Care Services (DHCS), Department of Water Resources, Central Valley Flood Protection Board
Development Types
Waste Treatment:Other (wastewater treatment plant)
Local Actions
Infrastructure Fac
Project Issues
Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Sewer Capacity, Transportation, Vegetation, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print