UCLA Luck Research Center and Related Projects / Facilities
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2000
Present Land Use
Campus
Document Description
The project would construct a Thermal Energy Storage system to augment the campus' Campus Energy Systems (Chiller / Cogeneration) facility chilled water production system, on a site northwest of the Life Sciences Building, just east of Parking Structure 9 on the UCLA Campus. The TES system is a component of the project analyzed in the above referenced Final EIR, which also included the Luck Research Center, the Seismic Replacement Building #2, and a Replacement Instructional Center. The TES system would include a concrete reinforced tank with a capacity of 3.5 million gallons, and related pumps, piping, valves, electrical systems, instruments and controls. The top of the tank would form a rectangular pad at the same level as the Court of Sciences. The bottom of the tank would be embedded in the hillside approximately sixty-five feet below that level. Related pumping systems and controls would be installed in or adjacent to the existing SEAS Chiller Plant. Remote monitoring and control systems would be installed within the existing Chiller / Cogeneration Plant. Construction of the TES is expected to begin in the summer of 2000.
Contact Information
Name
Tova Lelah
Agency Name
University of California, Los Angeles
Contact Types
Lead/Public Agency
Phone
Location
Cities
West Los Angeles
Counties
Los Angeles
Cross Streets
Westwood Plaza/Le Conte Avenue
Zip
90095
State Highways
I-405
Notice of Determination
Approving Agency
University of California, Los Angeles
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A