SAA R5-2002-0094
5 Documents in Project
Summary
SCH Number
2000011053
Lead Agency
City of San Diego
Document Title
SAA R5-2002-0094
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2002
Present Land Use
Presently in residential, open space and industrial use, zone A-1-5, A-1-10 (agriculture, 5 & 10 acre minimum lot size) and M-1A and M-2A (manufacturing) and located within the City's Future Urbanizing Area (FUA).
Document Description
CDFG is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1603 of the Fish and Game Code to the project applicant, Brookfield Motecito, LLC. The applicant proposes to alter the streambed to develop the Montecito residential community. To construct the Montecito subdivision, a total of 3.16 million cubic yards of earth will be graded on the 278.1 acre site. The subdivison will include 277 single-family residences, 36 open space lots totalling 125 acres and the preservation of an existing residence on a 1.7-acre lot. A sewer line will also be constructed offsite that will serve the Montecito development. Jurisdictional riparian comunities onsite include: southern willow scrub, wet meadow, freshwater marsh, mulefat scrub, and unvegetated stream.
Contact Information
Name
Christine Fritz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Poway, San Diego
Counties
San Diego
Cross Streets
Pomerado Road and Beeler Canyon Road
Total Acres
2,656.7
Airports
MCAS Miramar
Waterways
Beeler Creek
Township
14S
Range
2W
Section
26,25
Base
SB,BM
Other Location Info
Scripps Miramar Ranch
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes