SLO-46--Corridor Improvement Project -- Whitley 2B EA 05-33078 (Lake or Streambed Alteration Agreement No. 1600-2015-0045-R4)
18 Documents in Project
Summary
SCH Number
2000011033
Lead Agency
California Department of Transportation, District 5
Document Title
SLO-46--Corridor Improvement Project -- Whitley 2B EA 05-33078 (Lake or Streambed Alteration Agreement No. 1600-2015-0045-R4)
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2015
Document Description
CDFW has executed Streambed Alteration Agreement no. 1600-2015-0045-R4, pursuant to section 1602 of the fish and game code to the project applicant, Caltrans.
The applicant proposes to reinforce the river bank at location 1, replace the pipe culvert with an extended box culvert at location 2, and replace the bridge at location 3 with two new bridges to accommodate the conversion of SR 46 from a conventional two lane highway to a four lane divided expressway from PM 46.0 to 50.2, for the segment of the Corridor Improvement Project known as Whitley 2B.
Contact Information
Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Paso Robles, San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Limits of project KP 51.8/90.6 (PM 32.2/56.3)
State Highways
Highway 41
Airports
Paso Robles
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.