State Route 46 - Corridor Improvement Project Phase 3 - Agreement 2011-0206-R4

18 Documents in Project

Summary

SCH Number
2000011033
Lead Agency
California Department of Transportation, District 5
Document Title
State Route 46 - Corridor Improvement Project Phase 3 - Agreement 2011-0206-R4
Document Type
NOD - Notice of Determination
Received
Posted
2/14/2012
Document Description
The CDFG is executing a Lake and Streambed Alteration Agreement, pursuant to Section 1602 of the Fish and Game Code, to the Project applicant. Caltrans proposes the following activities at Location 1: The existing 113 ft long, 66 inch diameter reinforced concrete pipe (RCP) and headwalls will be removed and replaced with a new 318 ft long, 66 inch diameter RCP with new head and wingwalls. Rock Slope (RSP) will be placed at the outlet. Location 2: An ephermal drainage that meanders parallel to the highway needs to be re-aligned to accommodate the highway widening and a retaining wall that will prevent the removal of four blue oaks. Location 3: The Project would permanently fill ~500 ft of this drainage. After construction, this water will be conveyed through rock-lined swales and culverts into a storm water retention basin before it rejoins the existing drainage alignment. Location 4: Two new bridges will be constructed on a new alignment ~160 ft to the south of the existing bridge. The new bridges will be ~70 to 94 ft high and 962 ft long. The existing 138 inch structural steel plate pipe (SSPP) that conveys Pine Creek under the highway will remain and be extended ~27 ft at the inlet and ~160 ft at the outlet. The Project will place RSP at the outlet and at the inlet.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Paso Robles, San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Limits of project KP 51.8/90.6 (PM 32.2/56.3)
State Highways
Highway 41
Airports
Paso Robles

Notice of Determination

Approving Agency
California Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print