Addendum to Previously Adopted Negative Delcaration for the Schostag TM 52149, APN 185-490-02

4 Documents in Project

Summary

SCH Number
1999091048
Lead Agency
San Diego County
Document Title
Addendum to Previously Adopted Negative Delcaration for the Schostag TM 52149, APN 185-490-02
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2018
Present Land Use
The land is presently used as a citrus orchard. Some grading has taken place. Native vegetation exists on the western portion of the site on the steep slopes. Zoning is A70 Limited Agriculture.
Document Description
Applicant proposes to construct a new building pad for a future 40 foot by 40 foot workshop. In order to protect the proposed pad from storm water run-off, the Applicant will construct a 12 foot by 12.8 foot rip rap energy dissipater to capture the storm water and divert the flows into two 30 inch corrugated metal culvert pipes buried underground for 125 feet. The discharge will daylight into a 10 feet by 8 feet riprap energy dissipater downstream and discharge into the existing earthen channel. Construction time is estimated to be three months.

Contact Information

Name
Alan Monji
Agency Name
RWQCB
Contact Types
Lead/Public Agency

Location

Cities
Valley Center
Counties
San Diego
Cross Streets
Miller Road and Millco Lane
Total Acres
83.8
Parcel #
185-071-55
Township
11S
Range
1W
Section
6SW
Base
SBM

Notice of Determination

Approving Agency
RWQCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print