Document Description
The project is the subdivision of 14.1 acres into 21 lots for single family residential development. The lot sizes will be 0.5 acres. The project involves the grading of 68,000 cubic yards of balanced cut and fill. Maximum slope heights will be 20 feet with a slope gradient ratio of 2:1. Some retaining walls will be required with a maximum height of six feet. Access to the project site will be off of Sundown Lane onto a cul-de-sac bisecting the property length-wise. The project will receive public water and sewer service. The project requires approval of a tentative map for the land subdivision, a rezone to change the zoning use regulation from A70 limited agriculture to RR2 rural residential, and an administrative permit for the creation of a homeowners association.
Contact Information
Name
Alex Jewell
Agency Name
San Diego County, DPLU
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Cross Streets
Fury Lane and Sundown Lane
Total Acres
14.1
Parcel #
502-022-22
State Highways
94
Township
16S
Range
1W
Section
26
Base
SBM
Other Location Info
The project is located on the northeast corner of Fury Lane and Sundown Lane in the Valle de Oro Community Plan Area
Notice of Determination
Approving Agency
County of San Diego Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project