Draft Action Memorandum/Remedial Action Plan for Installation Restoration Program Sub-Site 2A, western portion of Site 2

2 Documents in Project

Summary

SCH Number
1999081073
Lead Agency
Department of Toxic Substances Control
Document Title
Draft Action Memorandum/Remedial Action Plan for Installation Restoration Program Sub-Site 2A, western portion of Site 2
Document Type
NOD - Notice of Determination
Received
Posted
1/3/2000
Present Land Use
The facility is located in an industrial zone.
Document Description
The United States Navy is proposing to excavate, remove and dispose of approximately 28,100 cubic yards of soil contaminated with metals, polynuclear aromatic hydrocarbon (PAHs), and dioxin from Installation Restoration Program (IRP) Sub-Site 2A. This area is the western portion of Site 2 at the Mole Pier in Naval Station-San Diego. The excavated soil will be transported to an appropriate disposal facility. The sidewalls and floors of the excavated areas will be sampled and the samples will be analyzed to confirm that the clean-up level has been met. The excavated areas will be backfilled with clean fill material. The air will be monitored to ensure compliance with the San Diego Air Pollution Control District Rules 50(d)(1), 52 and 54 regarding dust and lead emissions at an excavation site.

Contact Information

Name
Douglas Bautista
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
National City, San Diego
Counties
San Diego
Cross Streets
7th Street and Mole Road
Total Acres
6.5
State Highways
5
Railways
Sante Fe
Airports
San Diego
Schools
Kimball Elementary School
Waterways
San Diego Bay
Other Information
Olivewood School

Notice of Determination

Approving Agency
Department of Toxic Substance Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A