Central 1A Shared Baseline Road Project #02 - Infrastructure Segment F (Streambed Alteration Agreement No. 1600-2018-0113-R2)

49 Documents in Project

Summary

SCH Number
1999062020
Lead Agency
Placer County
Document Title
Central 1A Shared Baseline Road Project #02 - Infrastructure Segment F (Streambed Alteration Agreement No. 1600-2018-0113-R2)
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2018-0113-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Placer Vineyards Development Group, LLC (Permittee) as represented by Rick Langdon. The project is limited to the installation of a water line occurring within and to the south of the existing Baseline Road within the 18.8-acre project boundary of Segment "F". The water line will be installed to the south of the existing Baseline Road via an open trench, within a 25-foot temporary construction easement The water line will consist of a 24-inch ductile iron pipe, which will connect to a 24-inch ductile iron pipe to the east of Segment F, which will eventually tee into the existing 16-inch transmission main at the intersection of Walerga and Fiddyment Road. To install the water line, an open trench will be dug (both in the upland areas and through aquatic features where the line is proposed to be installed), the water line will be placed, and the dirt excavated to dig the open trench will be used to backfill the trench and bury the water line. The existing culverts will not be disturbed.

Contact Information

Name
Angela Calderaro
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Placer
Parcel #
023-200-005-000 and 023-200-037-000
Township
10/11N
Range
5E
Section
1/35
Other Location Info
The project is located at Curry Creek and tributaries to Curry Creek.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes