EM-20 Turnout and Transmission Main
5 Documents in Project
Summary
SCH Number
1999031053
Lead Agency
Rancho California Water District
Document Title
EM-20 Turnout and Transmission Main
Document Type
NOP - Notice of Preparation
Received
Document Description
The proposed RCWD project includes a Five-foot diameter pipeline and appurtenant structures from a new turnout located at Lake Skinner southernly along future Butterfield Stage Road and then westerly along Nicolas Toad to a terminus just east of Winchester Road/Highway 79. along the Butterfield Stage Road alignment, disturbance would generally be restricted to a 150-foot wide construction corridor, althugh upn to approximately 250 feet in width could be disturbed in some areas. Construction would include tough grading of a 60-foot wide portion of future Buterfield Stage Road. Along Nicolas Road, potential disturbance would be limited to an area 100 feet on either side of the existing road.
Contact Information
Name
Andrew Webster
Agency Name
Rancho California Water District (RCWD)
Contact Types
Lead/Public Agency
Phone
Location
Cities
Temecula
Counties
Riverside
Cross Streets
Nicolas Road, Butterfield Stage Road
State Highways
79
Waterways
Lake Skinner
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Health Care Services (DHCS), California Department of Transportation, District 8 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Quality
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.