Groundwater Replenishment System Final Expansion Project, Addendum No. 6 Groundwater Replenishment System EIR/EIS
18 Documents in Project
Summary
SCH Number
1998111030
Lead Agency
Orange County Water District
Document Title
Groundwater Replenishment System Final Expansion Project, Addendum No. 6 Groundwater Replenishment System EIR/EIS
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2016
Present Land Use
Water treatment facility and wastewater treatment facility. General Plan Manufacturing/Specific Plan
Document Description
The GWRS Final Expansion Project would produce approx. 25,000 AF of water supplies per year to help replenish the Orange County Groundwater basin. The additional wastewater flows from Plant No. 2 would increase the total water supplies of the GWRS to 128,000 acre feet per year. The GWRS Final Expansion Project involves seven construction activities; 1) increasing microfiltration capacity, 2) increasing reverse osmosis treatment capacity, 3) increasing ultraviolet treatment capacity, 4) increasing final product water capacity, 5) construction of an effluent pump station, 6) conversion of existing gravity pipeline to a pressurized pipeline and 7) demolition of Plant No. 2 existing plant pump station and construction of a new product pump station, and construction of Plant No. 2 headworks and bypass pipeline.
Contact Information
Name
Daniel Bott
Agency Name
Orange County Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fountain Valley
Counties
Orange
Cross Streets
multiple sites
State Highways
1
Waterways
Santa Ana River
Other Location Info
Huntington Beach
Notice of Determination
Approving Agency
Orange County Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.