Vesting Tentative Subdivision Map 2003-02 (VTSM 03-02[The Vineyard Phase III])

16 Documents in Project

Summary

SCH Number
1998102084
Lead Agency
City of Oakdale
Document Title
Vesting Tentative Subdivision Map 2003-02 (VTSM 03-02[The Vineyard Phase III])
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2006
Document Description
Adoption of a Resolution of Necessity and initiation of eminent domain proceedings in order to implement that portion of the Bridle Ridge Specific Plan (SP 98-01), which was approved by a Mitigated Negative Declaration in 1999, relating to the acquisition of a right of way to improve State Highway 108 between South Willowood Drive and Crane Road and Crane Road between State Highway 108 and Bridle Ridge Way. The State Highway 108 portion of the project area is currently a two-lane roadway (one travel lane in each direction) with a 60-foot wide right-of-way. In accordance with Sections 6.3.1 and 6.4.2 of the Bridle Ridge Specific Plan, the project will increase the State Highway 108 right-of-way to 110 feet, giving the roadway itself an 80-foot wide cross-section, curb to curb, to accommodate a four-lane arterial with a center median/turn lane. The Crane Road portion of the project area is also currently a two-lane road (one travel lane in each direction). In accordance with Sections 6.3.2 and 6.4.2 of the Bridle Ridge Way to an 80-foot cross-section with two travel lanes in each direction, a center median/left-turn lane, and two 8-foot shoulders to accommodate right-turn lanes and emergency stopping. Right- and left-turn pockets will also be developed on Crane Road at Highway 108. Finally, in accordance with Sections 6.3.1 and 6.4.2 of the Bridle Ridge Specific Plan, the project will add a traffic signal at the intersection of State Highway 108 and Crane Road. This project is further required by the conditions of approval for the Vesting Tentative Subdivision Map 2003-02 for Vineyard, Phase III.

Contact Information

Name
Steve Hallam
Agency Name
City of Oakdale
Contact Types
Lead/Public Agency

Location

Cities
Oakdale
Counties
Stanislaus
Cross Streets
Crane Rd. and E St.
Parcel #
63-13-15&25-26
State Highways
108
Railways
BN Sante Fe
Airports
Oakdale Airport
Waterways
STANISLAUS RIVER
Township
T2S
Range
R10E
Section
15/22
Base
MDBM

Notice of Determination

Approving Agency
City of Oakdale
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print